The Danida funded bridge and road project in northern Ghana comprised the construction of seven composite bridges in concrete and steel, as well as the establishment of access ramps and the rehabilitation of 27 km of road.

The project was based in three separate areas in northern Ghana, with distances of more than 280 km between them. This placed high demands on logistics and the allocation of machinery and personnel.

At the start of the project, two construction sites/camps were established, including offices, staff facilities, a concrete batching plant, and our own water supply and power generation systems. In addition, a fully equipped mechanical workshop, steel workshop, and laboratory for geotechnical, aggregate, and concrete testing were set up. The construction site was primarily built using containers and temporary structures.

In addition to the contractual works, Munck Civil Engineering focused on implementing its CSR strategy for the benefit of the surrounding communities. It was therefore natural for the organisation to plan and carry out CSR projects that helped  improve the general living standards of the local population. With a focus on social responsibility, a major voluntary effort was devoted, among other things, to improving the area’s water supply by drilling and establishing a number of wells for remote communities. Furthermore, a number of smaller renovation and construction projects were carried out at local schools, mosques, clinics, and hospitals, including extensive renovation of the hospital in Sandema.

Selected key quantities:

  • Bored foundation piles: 2,885 linear metres, Ø800 mm
  • Concrete: 23,000 m³
  • Reinforcement: 1,500 t
  • Structural steel: 2,400 t
  • Earthworks: 1.7 million m³

Client: Ghana Highway Authority
Contract type: Main contract
Period: 09.2018 – 03.2021